Aveo Florida finalizes new manufacturing and engineering facility building concept design. Now submitted for architectural building and site drawings. This green construction and operation facility is planned for our commercial building site which is close to the already operating Aveo Composites Production facility off US 1.
This facility will house assembly operations for a variety of Aveo product divisions, plus an engineering design center and distribution warehouse. This replaces the proposed manufacturing site for Flagler Airport industrial park (outside airport fence) which has been terminated due to the swamp status of the offered leased land. Aveo is committed to its growth in Flagler County, despite the obstacles thrown at it by the duplicitous airport manager and the naivety of the Daytona newspaper editorial staff who have never created a job in their lives.